Cellular Tower

  1. Step 1- Review and Prepare
  2. Step 2 - Create a Pro Account
  3. Step 3 - Apply
  4. Step 4 - Review and Payment
  5. Step 5 - Schedule an Inspection

Review and Prepare

The following documents need to be available for upload during the online application process. Please note, all documents need to be in a PDF format.

  • Plans and Job Specifications
  • Site Plan/Survey

Hard Copy Delivery

Along with uploading PDFs of plans and required submittals, two (2) full-size hard copies of all submittals are also required prior to plan review.

Deliver/mail hard copies of plans and other submittals to:

Blaine City Hall
Attn: Building Inspections
10801 Town Square Drive NE
Blaine MN 55449

Please include a cover sheet with the following information:

  • Permit Number (B20-00xx)
  • Project Address (if known)
  • Contact Information

Please note that any additional submittals of revisions must be by both hard copy and PDF upload into the IMS permit.