105th Avenue Reconstruction Update 06/13/2018

Posted on June 13, 2018 at 3:22 PM by Heidi Andrea

105th Avenue Road Surface
This week the contractor will be completing the paving of the bituminous trail along the north side of 105th Avenue from Radisson Road to Davenport Street.  They will also be installing the concrete sidewalk from Davenport Street to TH65 along with several pedestrian ramps throughout the project corridor.   Next week the contractor will be starting on the restoration of the boulevards on the north side of the street.



105th Avenue Road SurfaceTraffic should be prepared for the traffic switch that will be put in place next week.  Traffic will be split, where there will be one lane of traffic for east bound traffic on the south side and one lane of traffic for west bound traffic on the north side. 

Again traffic should expect minor delays as construction continues along the corridor.